HBF/Glenigan Housing Pipeline Q1 2017

Strong rise in planning permissions during 2017 Q1- HBF/Glenigan 

The residential development pipeline strengthened during the first quarter of 2017 according to the the HBF/ Glenigan pipeline report. The number of units approved during the quarter was 9% up on the fourth quarter of 2016 and 31% higher than during the same period last year. The year on year rise was driven by a 35% increase in the number of private housing units approved and a 32% rise in social housing units approved.

Overall Glenigan recorded the approval of around 98,100 residential units during the first quarter of 2017: The highest quarterly total since compilation of the pipeline data in 2008 Q1.

Click here to download the report.

Notes:

  • The Home Builders Federation (HBF) is the representative body of the home building industry in England and Wales. The HBF’s member firms account for some 80% of all new homes built in England and Wales in any one year, and include companies of all sizes, ranging from multi-national, household names through regionally based businesses to small local companies: www.hbf.co.uk
  • Glenigan is the UK’s leading provider of construction data, contract leads and construction market analysis. Combining comprehensive data gathering and exhaustive research with detailed statistical modelling and expert analysis, it delivers a trusted insight into UK construction trends and activity.
  • The housing approvals data analysed in this report is drawn from Glenigan’s extensive database of current and planned construction projects. Glenigan’s detailed coverage of planned housing projects across the UK offers valuable strategic and tactical insights into developers’ active sights and pipeline, with sites tracked through to completion. www.glenigan.com
  • ‘Permissions’ are measured when the first ‘reserve matter’ attached to the consent is approved. Before an ‘implentable’ permissions is granted that allows work to start on site, a planning obligations (S106) agreement will almost always have to be agreed and signed and all pre-commencement planning conditions attached to the permission have to be discharged. Some permissions will have up to 100 conditions attached.

Posted

in

by

Tags: